Industrial, Biomass & Municipal Sludge Drying
Wealthfrom Waste.Guaranteed.
Contact Us
Reduce.
01
Drop moisture content from 80% to 10–20%.
Volume shrinks 5–10×. Hauling cost falls 60–
75%.
Reuse.
02
Dried biosolids become soil amendment,
biomass fuel, or compost feedstock. Liability
becomes a product.
Revalue.
03
What was a cost center becomes a revenue
line. ESG targets get a measurable story.
Industries We Serve
If it has water in it,
we've dried it.
🏭
Payback: 2–4 Years
Municipal WWTP & Biosolids
Volume reduction for landfill cost avoidance.
🌾
Payback: 2–3 Years
Food & Beverage Processing
Spent grain, brewery sludge converted to animal feed.
⚗️
Payback: 2–3 Years
Chemical & Specialty Chemicals
Filtercake moisture reduction for stable handling.
📄
Payback: 1– Years
Pulp, Paper & Textile
ETP sludge drying. Live references in India.
💊
Payback: Custom
Pharmaceuticals
Closed-system drum dryers for ETP sludge.
⛏️
Payback: 2–3 Years
Metals, Mining & Biomass
Iron ETP sludge, tailings, agro-waste.
The Beltotherm Technology
Belt dryers built for 24/7
industrial sludge operation.
Technical Specifications — Belt Dryer
Capacity Range10–100 TPD
Input Moisture40–85% (wet basis)
Output Moisture<3–25%
Heat SourceElectric / Oil / Steam / Gas / Flue Gas / Thermic Fluid
Belt MaterialSS 304 / Woven Wire
Operating ModeContinuous 24/7
Control SystemPLC + HMI / Manual
Typical Payback1–3 Years
Installations112+ Global Delivered
Continuous Operation
Not batch. Engineered for continuous 24/7 operation.
Multi-Zone Temperature Control
Independent heating zones with PID control.
Any Heat Source
Steam, gas, thermic fluid, electricity, or waste flue gas.
Proven Results
Real plants. Real numbers.
Not projections.
Commercial Models
Own it. Or let us operate it.
Capital Purchase
Own the Asset.
Own the Upside.
Own the Upside.
Full capex · Maximum long-term ROI
- →Direct equipment purchase — FOB Kolkata
- →Payback typically 2–4 years from avoided hauling
- →1-year warranty + commissioning + training included
- →All co-product revenue belongs to your plant
BOOT / OPEX Model
Zero Capex.
Guaranteed Output.
Guaranteed Output.
Build-Operate-Own-Transfer · via Revalox
- →Finance finance, installs, and operates the dryer
- →You pay per tonne of sludge dried — no capital outlay
- →A complete Drying-as-a-Service (DaaS) solution
- →Asset transfers to client at end of contract
The Beltotherm Process
Four steps from sludge to recovered resource.
Most clients move from first conversation to a running dryer in 6–10 months.
01
Discovery
Understand Your Sludge
30-minute call. Map your sludge stream, current disposal cost, and capacity.
02
Pilot Trial
Send Us a Sample
Moisture trials at Kolkata pilot plant. Back within 5 working days.
03
Sizing & ROI
Right Machine. Real Numbers.
Financial model with your actual cost inputs. Payback, IRR, avoided costs.
04
Build & Commission
Manufacture, Install, Train.
12–16 weeks manufacture, installation, commissioning, 1-year warranty.
Get In Touch
Turning Waste Stream into a Revenue System
Reduce Disposable Costs by up to 90%, Recover Resources, and Achieve Sustainable Operations with Advanced Sludge Drying Technology
Reduce Waste
Recover Value.
REACH US AT :
+91 98311 73874(WhatsApp available)
Email
Headquarters
10/C Middleton Row, 3rd Floor
Kolkata 700071, India
Kolkata 700071, India
Website
Response Time
Within 5 working days · Technical specification & pricing included